Chin 10 Canal Project

Culverts in canal

In this canal-cleaning project, Dennis Dirtworx performed two canal realignments. The project entailed a large-diameter culvert road crossing, multiple drop structures, and a 4,000-tonne armored bank lining.  Overall, Dennis Dirtworx moved 30,000 cubic meters of earth to install five large concrete structures.

BRID Lomond Canal Rehab

This project involved 13 kilometers of canal cleaning and armoring. The original contract stipulated 7 km, but another 6 km were added post-contract.  A total of 425,000 cubic meters of earth was moved. Moreover, 50,000 tonnes of armor was produced in-house, trucked, and placed along the canal. Dennis Dirtworx installed 30 structures ranging from farm […]