SMRID Cameron Project

Cameron Project

Dennis Dirtworx relocated an open canal to a pipeline system. A large-diameter (1,200mm – 100mm) pipe water main was installed. Six Lethbridge County road crossings were performed, with complete traffic management strategies applied. 

Additionally, a 130-meter auger bore was coordinated and completed under the Canadian Pacific Railway and Highway. Three 9,100-meter pipelines were installed, and 100,000 cubic meters of earth were moved. There were multiple tie-ins to the existing infrastructure.