Chin Canal Rehabilitation

Chin 2 involved the rehabilitation of a canal. 100,000 cubic meters of earth had to be moved to deconstruct the old infrastructure. A large-diameter (900mm – 100mm) Rip Rap water main was installed.

The Dennis Dirtworx team was also responsible for multiple auger crossings under Alberta transportation highways, and for land restoration. The team worked well with SMRID and MPE Engineering.

This project was completed in the spring of 2019.

Share:

More Posts

Dennis Dirtworx logo white

Follow us on Facebook and Instagram!