Culverts in canal

In this canal-cleaning project, Dennis Dirtworx performed two canal realignments. The project entailed a large-diameter culvert road crossing, multiple drop structures, and a 4,000-tonne armored bank lining

Overall, Dennis Dirtworx moved 30,000 cubic meters of earth to install five large concrete structures.