Chin 10 Canal Project

Culverts in canal

In this canal-cleaning project, Dennis Dirtworx performed two canal realignments. The project entailed a large-diameter culvert road crossing, multiple drop structures, and a 4,000-tonne armored bank lining

Overall, Dennis Dirtworx moved 30,000 cubic meters of earth to install five large concrete structures.

Share:

Share on facebook
Share on twitter
Share on linkedin
Share on email

More Posts

BRID Lomond Canal Rehab

This project involved 13 kilometers of canal cleaning and armoring. The original contract stipulated 7 km, but another 6 km were added post-contract.  A total

Read More »
Dennis Dirtworx logo white

Follow us on Facebook and Instagram!