BRID Lomond Canal Rehab

This project involved 13 kilometers of canal cleaning and armoring. The original contract stipulated 7 km, but another 6 km were added post-contract. 

A total of 425,000 cubic meters of earth was moved. Moreover, 50,000 tonnes of armor was produced in-house, trucked, and placed along the canal. Dennis Dirtworx installed 30 structures ranging from farm and domestic turnouts to drain inlets.

Share:

More Posts

Dennis Dirtworx logo white

Follow us on Facebook and Instagram!